DSC00190.JPG Channel carved by flood water from Eyemore cutting at Victoria Bridge, washing out trackbed & exposing the end abutment, Fri 22/06/07 DSC00192.JPG Washout at Bewdley end of Victoria Bridge, Fri 22/06/07 DSC00193.JPG Debris on Victoria Bridge, Fri 22/06/07 DSC00194.JPG Washout at Bewdley end of Victoria Bridge, Fri 22/06/07 DSC00207.JPG View from Oldbury viaduct looking towards Hampton Loade, Sun 01/07/07 DSC00208.JPG View of Oldbury viaduct looking towards Bridgnorth, Sun 01/07/07 DSC00209.JPG Adjacent to Knowlesands industrial estate looking towards Hampton Loade, Sun 01/07/07 DSC00211.JPG Slip adjacent to Knowlesands industrial estate looking towards Bridgnorth, Sun 01/07/07 DSC00212.JPG Slip adjacent to Knowlesands industrial estate looking towards Hampton Loade, Sun 01/07/07 DSC00213.JPG Another slip adjacent to Knowlesands industrial estate looking towards Hampton Loade, Sun 01/07/07 DSC00214.JPG View of the undercutting of the formation at a 3rd slip nearer to Knowlesands tunnel, Sun 01/07/07 DSC00215.JPG View of the undercutting of the formation at a 3rd slip nearer to Knowlesands tunnel, Sun 01/07/07 DSC00238.JPG New sleepers at Kidderminster 19/70/07 DSC00239.JPG New sleepers at Kidderminster 19/70/07 DSC00245.JPG Slip north of Hampton Loade looking towards Bridgnorth 21/07/07 DSC00246.JPG Slip north of Hampton Loade looking towards Hampton Loade 21/07/07 DSC00247.JPG The road leading past Hampton Loade station 21/07/07 DSC00254.JPG Eyemore cutting looking towards Victoria Bridge 22/07/07 DSC00256.JPG Repair work at Victoria Bridge 22/07/07 DSC00258.JPG Repair work at Victoria Bridge 22/07/07 DSC00260.JPG New drainage being installed at Victoria Bridge 22/07/07 DSC00316.JPG Road Railer at Waterworks crossing 19/08/07 DSC00318.JPG Spoil from slip north of Hampton Loade piled up at Waterworks Crossing 19/08/07 DSC00319.JPG Scene just north of Hampton Loade 19/08/07 DSC00320.JPG Scene just north of Hampton Loade 19/08/07 DSC00322.JPG New drainage being installed just north of Hampton Loade 19/08/07 DSC00323.JPG New drainage being installed just north of Hampton Loade 19/08/07 DSC00325.JPG Scene just north of Hampton Loade 19/08/07 DSC00326.JPG New drainage being installed just north of Hampton Loade 19/08/07 DSC00327.JPG Scene just north of Fisherman's Crossing 19/08/07 DSC00330.JPG Scene just north of Fisherman's Crossing DSC00332.JPG Refurbished S&T components being prepared for installed at Highley 19/08/07 DSC00336.JPG Refurbished S&T components being prepared for installed at Highley 19/08/07 DSC00413.JPG Re-instated trackbed and new drainage channel at Knowlesands 21/10/07 DSC00414.JPG Re-instated trackbed and new drainage channel at Knowlesands 21/10/07 DSC00417.JPG Track Gopher & Road/Rail Dumpers at Knowlesands 21/10/07 DSC00418.JPG Re-erected signal post, new cable troughing and relayed track at Oldbury viaduct 21/10/07 DSC00419.JPG P. Way relaying track with flat bottom rail looking towards Knowlesands 21/10/07 DSC00420.JPG Formation awaiting track relaying 21/10/07. By the end of the day, track had been layed over much of this view. DSC00421.JPG Concrete pile capping beam and seeded reinstated back at Oldbury viaduct 21/10/07 DSC00422.JPG Reinstated and seeded bank at Oldbury viaduct 21/10/07 DSC00457.JPG Reinstated track & re-erected Bridgnorth down home signal in the November gloom at Oldbury Viaduct. There is still work to do before the signalling at this site can be brought into use. 25/11/07 DSC00458.JPG Looking from Oldbury Viaduct towards Knowlesands Tunnel with P. Way "regulating" the ballast. 25/11/07 DSC00459.JPG Reinstated track & re-erected Bridgnorth down home signal in the November gloom at Oldbury Viaduct. There is still work to do before the signalling at this site can be brought into use. 25/11/07 DSC00461.JPG Relaid track and refurbised signalling equipment at Knowlesands with P. Way at work. 25/11/07 DSC00462.JPG Reinstated track in the November gloom at Knowlesands looking towards Oldbury Viaduct. 25/11/07 DSC00465.JPG Reinstated track in the November gloom at Knowlesands looking towards Knowlesands Tunnel. The ballast still needs final attention here. 25/11/07 DSC00514.JPG Work in progress terminating replacement S&T cables about 3/4 mile north of Hampton Loade 30/12/2007 DSC00515.JPG An unusually cheerful member of the S&T dept with a freshly stripped back cable about 3/4 mile north of Hampton Loade 30/12/2007 DSC00521.JPG Site of pile driving by Sterns Cottage. Looking towards Bridgnorth. 06/01/08 DSC00523.JPG Site of pile driving by Sterns Cottage. Looking towards Bridgnorth. The vertical piles and inclined piles have been curing over Xmas. A capping beam will then be cast to tie them together. 06/01/08 DSC00524.JPG Site of pile driving by Sterns Cottage. Looking towards Hampton Loade. 06/01/08 DSC00525.JPG Site of pile driving by Sterns Cottage. Looking towards Hampton Loade. 06/01/08 DSC00526.JPG Replacement culvert just north of Sterns Cottage. 06/01/08 DSC00527.JPG Replacement culvert just north of Sterns Cottage. The river is on the opposite side of the reinstated embankment. 06/01/08 DSC00528.JPG The is the outflow on the river side of the culvert. 06/01/08 DSC00532.JPG Tree clearance & new track awaiting ballasting in Eyemore Cutting 19/01/2008 DSC00545.JPG Track in progress of being re-instated at Highley 10/02/08 DSC00546.JPG The view from the rebuilt embankment towards the river 10/02/08 DSC00559.JPG Work in progress installing new S&T equipment location cupboard at Highley down distant 24/02/08 DSC00561.JPG Borle Viaduct on 24/02/08 showing gabion baskets being installed at the foot of the embankment DSC00562.JPG Borle Viaduct on 24/02/08 looking towards the River Severn DSC00563.JPG Borle Viaduct on 24/02/08 showing the north side shot-creting DSC00564.JPG Embankment awaiting reinstatement on south side of Borle viaduct 24/02/08 DSC00565.JPG Borle Viaduct on 24/02/08 showing the north side shot-creting