Scene just north of Hampton Loade 19/08/07 1600x1200 DSC00320.JPG |
New drainage being installed just north of Hampton Loade 19/08/07 1600x1200 DSC00322.JPG |
New drainage being installed just north of Hampton Loade 19/08/07 1600x1200 DSC00323.JPG |
Scene just north of Hampton Loade 19/08/07 1600x1200 DSC00325.JPG |
New drainage being installed just north of Hampton Loade 19/08/07 1600x1200 DSC00326.JPG |
Scene just north of Fisherman's Crossing 19/08/07 1600x1200 DSC00327.JPG |
Scene just north of Fisherman's Crossing 1200x1600 DSC00330.JPG |
Refurbished S&T components being prepared for installed at Highley 19/08/07 1600x1200 DSC00332.JPG |
Refurbished S&T components being prepared for installed at Highley 19/08/07 1600x1200 DSC00336.JPG |
Re-instated trackbed and new drainage channel at Knowlesands 21/10/07 1280x960 DSC00413.JPG |
Re-instated trackbed and new drainage channel at Knowlesands 21/10/07 1280x960 DSC00414.JPG |
Track Gopher & Road/Rail Dumpers at Knowlesands 21/10/07 1280x960 DSC00417.JPG |
Re-erected signal post, new cable troughing and relayed track at Oldbury viaduct 21/10/07 1280x960 DSC00418.JPG |
P. Way relaying track with flat bottom rail looking towards Knowlesands 21/10/07 1280x960 DSC00419.JPG |
Formation awaiting track relaying 21/10/07. By the end of the day, track had been layed over much of this view. 1280x960 DSC00420.JPG |
Concrete pile capping beam and seeded reinstated back at Oldbury viaduct 21/10/07 960x1280 DSC00421.JPG |
Reinstated and seeded bank at Oldbury viaduct 21/10/07 1280x960 DSC00422.JPG |
Reinstated track & re-erected Bridgnorth down home signal in the November gloom at Oldbury Viaduct. There is still work to do before the signalling at this site can be brought into use. 25/11/07 1280x960 DSC00457.JPG |
Looking from Oldbury Viaduct towards Knowlesands Tunnel with P. Way "regulating" the ballast. 25/11/07 960x1280 DSC00458.JPG |
Reinstated track & re-erected Bridgnorth down home signal in the November gloom at Oldbury Viaduct. There is still work to do before the signalling at this site can be brought into use. 25/11/07 960x1280 DSC00459.JPG |
Relaid track and refurbised signalling equipment at Knowlesands with P. Way at work. 25/11/07 960x1280 DSC00461.JPG |
Reinstated track in the November gloom at Knowlesands looking towards Oldbury Viaduct. 25/11/07 960x1280 DSC00462.JPG |
Reinstated track in the November gloom at Knowlesands looking towards Knowlesands Tunnel. The ballast still needs final attention here. 25/11/07 960x1280 DSC00465.JPG |
Work in progress terminating replacement S&T cables about 3/4 mile north of Hampton Loade 30/12/2007 1280x960 DSC00514.JPG |
An unusually cheerful member of the S&T dept with a freshly stripped back cable about 3/4 mile north of Hampton Loade 30/12/2007 1280x960 DSC00515.JPG |
Site of pile driving by Sterns Cottage. Looking towards Bridgnorth. 06/01/08 960x1280 DSC00521.JPG |
Site of pile driving by Sterns Cottage. Looking towards Bridgnorth. The vertical piles and inclined piles have been curing over Xmas. A capping beam will then be cast to tie them together. 06/01/08 960x1280 DSC00523.JPG |
Site of pile driving by Sterns Cottage. Looking towards Hampton Loade. 06/01/08 1280x960 DSC00524.JPG |
Site of pile driving by Sterns Cottage. Looking towards Hampton Loade. 06/01/08 1280x960 DSC00525.JPG |
Replacement culvert just north of Sterns Cottage. 06/01/08 1280x960 DSC00526.JPG |
Replacement culvert just north of Sterns Cottage. The river is on the opposite side of the reinstated embankment. 06/01/08 960x1280 DSC00527.JPG |
The is the outflow on the river side of the culvert. 06/01/08 960x1280 DSC00528.JPG |
Tree clearance & new track awaiting ballasting in Eyemore Cutting 19/01/2008 960x1280 DSC00532.JPG |
Track in progress of being re-instated at Highley 10/02/08 960x1280 DSC00545.JPG |
The view from the rebuilt embankment towards the river 10/02/08 960x1280 DSC00546.JPG |
Work in progress installing new S&T equipment location cupboard at Highley down distant 24/02/08 960x1280 DSC00559.JPG |
| | | |